Category
Research Reactor (MURR)
Policy Number
MURR-001-05
Last Updated
- Logs and forms completed by reactor operators to document reactor related activities performed. They may include:
- Console watch logs, listing each activity performed by the operators
- Weekly reactor startup and shutdown check sheets
- Records of maintenance and repair, including compliance checks, special maintenance and preventive maintenance
- Reactor routine patrol logs
- Nuclear data daily logs, documenting readings taken from control room instrumentation panels
- Strip Chart (stack effluent, reactor, pool, and demineralizer flow charts, reactor and pool temperature charts, channel 5 and 6 power range charts, source, intermediate and wide range charts, and Area Radiation Monitor System (ARMS) Charts.
- Work control packages for work performed outside the scope
- of the Radiation Work Permit and Modification Record programs. Such packages are not otherwise listed in the Records Retention Authorization.
- Technical Specification required audits
- HP Survey Records (non-dose related)
- Instrumentation Calibration records (non-dose related)
Series Cutoff: Date of Creation
Disposition Action: Securely Destroy or Delete
Notes and Citations:
- MURR Technical Specification (TS) 6.7, 鈥淩ecords鈥 (5 years)
- MURR Safety Analysis Report (SAR) Section 12.5, 鈥淩ecords鈥 (5 years),
- ANSI/ANS 15.1, Section 6.8, 鈥淩ecords鈥 (5 years),
- 10 CFR 20.2103(a) (3 years) 鈥 Radiological Surveys & Calibrations